FELTON, Santa Cruz County — October 26, 2026. Road construction on Highway 9 near San Lorenzo Valley’s school complex is scheduled to continue day and night this week. Caltrans is building a sidewalk and safer bicycle shoulder on the southbound side of the highway, connecting the Graham Hill Road area with the schools north of downtown Felton.
The agency said the temporary concrete barrier occupying a southbound lane near the Graham Hill Road/Felton Empire Road intersection is expected to remain in place through February 2027. Work scheduled October 26–30 includes removing sections of an old wall, forming sidewalks and concrete work at several highway post-mile locations. The project’s overall completion is estimated for August 2027, subject to weather and construction changes.
Why this is important to local families
Today, students and other pedestrians have had to navigate narrow shoulders on a busy connector between Felton and the San Lorenzo Valley schools. The planned improvements include sidewalks varying from four to six feet where space allows, a widened shoulder for cyclists and a new bus pad by the high school. These are future project benefits, not facilities that are already open.
Allow extra time when traveling in the school corridor. Sources: Caltrans District 5 weekly update, October 23 and official project description. More coverage at Felton News.
Help this community newspaper grow
Your support helps build coverage for the people and places this local newspaper serves.
Donate once by card ↗Support Felton News
Choose how to support Felton News:
Credit / Debit Card via StripeChoose an amount from $1. One-time support through the publisher's LINKERNO Stripe account.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Felton News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Felton News
- Felton’s Quail Hollow Ranch Adds Six Miles of Trails Across 80 Acres: County Schedules October 26 Opening →
- Felton News: October 22 Highway 9 Sidewalk Town Hall Offers Residents a Say on Pedestrian Safety →
- Felton News: Henry Cowell’s Redwood Grove Loop — Accessible Forest Walk and Important Dog Restrictions →
- Felton: Pipeline Road Trail Access Affected at Henry Cowell Through Oct. 21 →
COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.